Customization: | Available |
---|---|
Cooling Way: | Water Cooling |
Style: | Horizontal |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Machine Configuration:
The equipment is equipped with a feeding manipulator, automatic unloading device, laser tracking, automatic pulse welding power supply, dust removal system automatic interception batching mechanism + logical material distribution system.
Main Parameters:
Cylinder Body Circumferential Welding Machine Type | : MIG/MAG Welding |
Welding Machine Structure | : Steel Profile & Plate |
Cylinder Position | : Horizontal |
Cylinder Clamping Position | : Vertical |
Spot Welding | : Non Required |
Compressed Air Source | : 0.6-0.8 MPa |
Approximate Cycle Time of Welding Process | : Around 75 seconds(Taking 11 kg Cylinder as sample) |
Extra Configuration | : Laser Tracking, automatic positioning, dust removal system |
For more configuration or parameter information, welcome to inquire!
Suitable for All Sizes of LPG Cylinders!
Acceptable Customization!!!
Wuxi Longterm Machinery Technologies Co., Ltd. is a professional new welded gas cylinder making machine line and old cylinder repairing line machines manufacturer with more than 25 years experience in China, and own an all-sided technical team to research and improve the technology all the time. With good reputation and qualified machines, we have supplied several high standard gas cylinder production lines to the world markets, like USA, Brazil, Turkey, Bangladesh, Vietnam, Ghana, Nigeria, Thailand,etc.
1. Applicable cylinder types: LPG, Propane, refrigerant or other welded cylinders
2. Can provide other supporting cylidner production equipment
3. Compared with SAW welding, or MIG welding equipment can save more time and raw material cost.
4. We have single and double head welding machine which can weld 3-pieces cylinders
Pre-sales questionaire:
1. What is your cylinder size? If you have drawings it will be much better.
2. What is your capacity requirement? (Per hour/Per shift)