Design and manufacture in accordance with the national standard GB/T9251-2011 "cylinder hydrostatic test method and GB 5842-2006" liquefied petroleum gas cylinder "and so on.It's main composed of water pressure testing machine, roller conveyer, hydraulic pneumatic system and control system, etc.
Characteristic and performance
Main technical data
1.Testing pressure:3.2MPa
2.Testing efficiency:250-260pcs/h
3.Air pressure:0.6-0.8 MPa
4, Water pressure cylinder model:QGSφ63×280MF1 12pcs
Drainage pressure cylinder model:QGSφ125×250MF1 12pcs
Limited cylinder model:QGSφ80×100MF2 3pcs
5, Pneumatic solenoid valve 12pcs
6, Voltage,Frequency: 3-phase 380V/50Hz
7,Special Suppression head 12pcs,High pressure pneumatic valve:12pcs,Ball check valves 12pcs,Exhaust valve 12pcs
8,Hydraulic test pump model:2DSY-400/10,
Power:3KW;
Volume:400L/h
Pressure:10MPa
9, Roller conveying speed:V=0-5m/s
10,Weight:5T
Structure and function
This machine is made up of the hydraulic pressure testing machine, roller conveyer, hydraulic pneumatic system and control system.
1. The water pressure testing machine is composed of frame, water pressure device, the holding device, drainage clamping device, water pump, hydraulic test pump, 1# limit ,2# limit, 3# limit , pneumatic hydraulic parts.Frame panel is equipped with 9 pressure gauge, one of them is precision pressure measuring instrument, used to check test pressure with pressure measuring instrument, the other eight were used to show the actual test pressure and air pressure after the adjustment.
2. The roller conveyer, driven by the motor reducer and gear transmission, to send gas cylinders to set position.
3. Hydraulic pneumatic system: the motor drives the water pump to supply water pressure testing machine, testing water after the compressed air pressure drainage recycling back into water tank.Compressed air through the pneumatic circuit applied to each cylinder, control cylinder action accordingly.
4. The operation control system: the control cabinet of the whole control system, the distribution of each control button on the control panel.Can be realized in the process of liquefied petroleum gas cylinder pressure test, irrigation, suppression, unloading, drainage, and out of the bottle, automatically.
Shot blasting machine Residual liquid removing machine
Installation and debugging
1, According to the specific situation of the workshop, locate equipment installation (roller conveyer top high above the ground is 400 mm).
2. connecting power and gas source, checking the water pump, hydraulic test pump, drive
3.According to the relevant button, checking whether the parts movement is flexible.
4.Pushing and pull the hand control valve, check wheter the related parts operation is flexible.
5.Sequence of operation:
Matter Need Attention
1. Ensure the power supply and the gas supply smooth, prohibit to drive the motor in reversal so as to damage the components.
2. We prepare the 2-2.5M3 compression air storage tank to ensure the gas supply pressure 0.5-0.6Mpa. The main pipe and its interface of air inlet pipe should be more than G1", ensure the gas supply flowing volume is enough.
3. Keep water clear in water tank, without any dirty, without any float sundries. If there is, remove the float drifting sundries, in case it blocks the pipeline and effect the normal test.
4. Add 20# machinery oil onto the standard level for reducer, often check it.
5. Before shift over, pls press the "stop" button, cut off the power supply and gas supply.
6. There is safety protection for earthing in machine.
7. If you find there is abnormal on the indication of pressure-proof test actual pressure measuring meter when you start up the first batch gas cylinder testing every day, please calibrate it by the precision pressure measuring meter.
8. When equipment runs normally, pls close tightly the valve access to the precision pressure measuring meter (i.e. the calibration valve, also named as pressure meter switch).
Wuxi Longterm Machinery Technologies Co.,Ltd is the professional manufacturer of auto-welding equipment (MIG, TIG, MAG, PAW) and automatic welding system integration, as well as related equipment.Due to highly automatic, simple operation, welding strength and service life with the same stainless steel and plate, is widely used in aerospace, chemical industry, machinery, pressure vessels, fire extinguishers, water heater, enamel water tank, stainless steel products and other industries.
------ Our Factory Site
Our strong machining ability
Our hired employees are over 100 for different working process, such as milling lathe, punching machine, heat treatment, grinding machine, cause we make all machine parts by ourselves, we can ensure the parts quality by 100%.
Additionally, with strong manufacuting ability, we can delivery every order on time.
Maintenance
1. Add 20# machinery oil to lubricate the both side sliding blocks of pressure test pump for each shift. Add the 20# machinery oil into the reducer tank and the driving reducer meeting to requirement. After 36 hours, change one time. Then change oil one time for each 500 hours.
2. Ensure the equipment is clear without any dirty. If the pressure test pump is not used for long term, pls add the anti-corrosion water. After 3~5 minutes when start up machine, pls drain out the water storage in pipe of machine.
3. Pls add the 22# steam machinery oil into the triple oil forge device, and clean up the air filtration water piling. Add the oil into the roller table both side bearings twice for each working shift, ensure its lubrication.
4. Calibrate the pressure meter as stipulation.