Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant

Product Details
Customization: Available
Type: Coating Production Line
Coating: Powder Coating
Still deciding? Get samples of $ !
Request Sample
Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (15)
  • Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
  • Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
  • Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
  • Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
  • Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
  • Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Packaging & Shipping
  • Related Machines
  • After Sales Service
  • Company Profile
  • FAQ
Overview

Basic Info.

Substrate
Steel
Certification
CE, ISO, SGS
Condition
New
Product Name
Cylinder Powder Coating Line
Cylinder Size
3kg-50kg
Workpiece Weight
<30kg
Braced Chain
Qxt250/50kg Light Common Chain
Machine Capacity
2000PCS/12hours
Linear Speed
1.4m/Min
Rated Input Valtage
220-380V
Heating Source
Nature Gas(LPG)
Oven Working Temperature
180-190ºC
Working Method
Auto + Manual
Transport Package
Standard Seaworthy Package
Specification
all sizes cylinders
Trademark
HLT
Origin
Wuxi, Jiangsu
HS Code
8447902000
Production Capacity
20 Sets/Year

Product Description

Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
Product Description

 

Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
Product Parameters

1. Powder coating line design
No Name Details
1 Workpiece Gas cylinder
2 Workpiece material Metal
3 Max. workpiece size Φ300×H570(mm)
4 Workpiece weight ≤30kg
5 Braced chain QXT250/50Kg light common chain
6 Machine capacity 2000pcs/12hours
7 Hanging type One cylinder every two pitch, that means one cylinder per 500mm.
8 Linear speed 2000pcs÷12h÷60min×0.5m/hang=1.4m/min
9 Heating source Nature gas(LPG)
10 Location area See layout drawing, beam bottom height 8.5 meters
 Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant

2. Process flow diagram
This line consists of powder coating chamber, booth, curing bake, suspend conveyor and electric control system.
No Name Transit time Working temperature Operation
1 Loading   RT Manual
2 Powder coating   RT Auto+manual
3 baking 17-18min 180-190ºC Heated air circle
4 cooling 20min    
5 unloading     Manual
 
3. Curing bake
The drying tunnel consists of three parts: drying tunnel. Heating system and exhaust system.
3.1 Drying tunnel
 
No Name Technical parameter
1 Overall structure Bridge type
2 No of tunnels 4
3 Size of the inner tunnel L14×W3.2×H2.1(m). Leg height 2.5meters
4 Thickness of the insulation 150mm
5 Material of the insulation High quality rock wool board
6 Unit weight of the insulation 100Kg/m3
7 Material of the inner plate δ0.8 galvanized steel sheet
8 Metarial of the outer plate δ0.8 color sheet
9 Structure of inner and outer plate Assembly structure
10 Material of the inner angle plate δ1 galvanized steel sheet
11 Material of the outer angle plate δ3 hot-rolled sheet with paint
12 Supporter material of the tunnel δ3 carbon steel sheet, edgefold with paint
13 Outer temperature of the tunnel Lower than environment temperature 15ºC
14 Inner temperature of the tunnel 180ºC
15 Drain cracking-off Top of the tunnel
 
3.2. heating system: consists of heating chamber, burner, heated air recycling fan, return airway and temperature control system.
(1)heating room: an access door is on the side of the heating chamber for future repairing.
No Name Technical parameter
1 Position and number of heating room Bottom of the bake tunnel, 1 set
2 Heating room configuration 300000 calories, 1 set
3 Inner plate of the heating room Galvanized steel, δ1
4 Outer plate of the heating room Cold-roll steel sheet, δ1.5
5 Thickness of the insulation 150mm
6 Material of the insulation High quality rock wool board
7 Unit weight of the insulation 100Kg/m3
8 Material of the inner angle plate δ1 galvanized steel sheet
9 Material of the outer angle plate δ3 hot-rolled sheet with paint
10 Supporter material of the tunnel δ3 carbon steel sheet, edgefold with paint
11 Structure of inner and outer plate Assembly structure
 
(2) burner
1 set, 300000 calories
Gas consumption: 10-15m3/h
Brand: Italian Riello RS34
 
(3)burning tank
Heat exchanger is used to transfer the heat to heating room, then hot-air blower will bring the heat to the tunnel. Adopts direct-fired heating, the burning tank is stainless steel with high temperature filter.
 
(4)Thermal cycling fan: adopts special air-cooled centrifugal fan
No Name Parameter
1 Model GCF-630C
2 Rotation speed 1250r/min
3 Air flow volume 13500m3/h
4 Total pressure 900Pα
5 Motor power 5.5KW
6 Fan structure Impeller is in the heating room
7 Insulation thickness 150mm
9 Impeller material 16Mn
10 No. Of fans 1 set
11 Fans supplier Shanghai Shuyuan or Kewangda
 
(5) Air delivery & returning duct
 
No Name Parameter
1 Hot air recycling Internal recycle, no outer tubes
2 Air delivery type Under floor air delivery
3 Air returning type Under floor air returning
4 Duct material Galvanized steelδ1
5 No of air regulation plate 1 set
6 Material of air regulation plate Galvanized steelδ1
(6) Temperature control system
Drying tunnel uses digital temperature controller to adjust the temperature automatically, it can display and control the drying tunnel temperature in real-time.
The temperature measurement uses platinum resistor temperature sensor.
The drying tunnel temperature can be adjusted continuously from normal temperature to 200°C.
 
3.3. Exhaust pipe
The entrance/exit of the drying tunnel on the top equips with exhaust pipe and  butterfly valve, it is used for draining the exhaust gas of the drying tunnel.
The material of the exhaust pipe is δ1mm galvanized sheet.
 Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant

4. Hang type conveyor
Hang type conveyor consist of driving device, tension device, variable-frequency governor, chain, straight conveyor, bend conveyor, temperature flexible conveyor, inspection conveyor and lubrication system etc.
Variable -frequency governor uses Mitsubishi. The speed is 1.4 m/min.
The lubrication system uses automatic oil drop device.
Hang type conveyor equips with 1 set driving device, 1 set weight-loaded type tension device, using frequency to adjust speed.
 
No Name Technical specification
1 Driving device model QXT-250
2 Driving device quantity 1 set
3 Overload protection for driving device Adjustable safety clutch+travel switch
4 Driving device power 3.0KW
5 Tension device type Weight-loaded type
6 Tension device quantity 1set
7 Turning radius of tension device ≥R800(mm)
8 Frequency converter Mitsubishi 1 set
9 Conveyor chain length 125m
10 Conveyor chain pitch 250mm
11 Hoisting weight of conveyor chain single point 50Kg
12 Production speed 1.4m/min
13 Production speed adjustable method Frequency control(0.6-2.0m/min)
14 Column quantity,material Complete set, steel section
15 Bottom plate quantity,material Complete set, hot-rolled sheet steel
16 Beam quantity,material Complete set, steel section
17 Diagonal bracing quantity,material Complete set, steel section
18 lubrication system Automatic oil drop device 1 set
19 "C" type jig and rotary rack 250 pcs
20 Rotary rack 1set
 Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant

5. Powder coating system
5.1. Technical parameter
Machine type Manual
 
Max. Hang range of the workpiece
 
W310xH570
Conveyor speed
 
About 1.4m/min
 
Type of conveyor Suspend conveyor
 
Coating material
 Polyester powder and epoxy powder
Color 2 kinds
Powder supplier
 Local
Type of coating chamber
 Filter type powder coating chamber
Type of powder coating systems
 Corona torch
No of powder coating systems
 6 sets auto, 1 set manual spraying torch
Type of hoister
 Reciprocating hoister
No of hoister 1 set
No of the torch on the hoister 2 sets on left, 2 sets on top, 2 sets on bottom
Suction capacity of coating chamber 11000 m3/h
Required pressure for compressed air
 6 - 8 bar , + 0.1 bar
Remaining water in the compressed air
 Max. 1.3 g/N m3 
Remaining oil in the compressed air Max. 0.1 mg/N m3  
Estimated air consumption for chamber
 120 N m3/h
Power supply 220/380 VAC, 50Hz, 3L/N/PE, 3 phase 5 wires
Estimated power consumption for powder coating  
 Approx. 10 KVA
Estimated power consumption for chamber
 15KVA  -- powder coating chamber
Requirement for operation condition Relative humidity<80%
Ambient temperature< 30ºC
Air speed near the chamber< 0.1 m/sec
Packaging & Shipping


Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
 
Related Machines
Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
Residual liquid removal machine
Used for the recycling of residual gas and liquid in the LPG cylinder.
Main technical parameter:
1. Power:7.5kw
2. Gas & liquid separator:0.4m³
3. Air source pressure:0.4-0.6Mpa
4. Turnover period:<30s/time
5. One time residual cleaning time:≥2min
6. Overall size:4700*1500*2050mm
7. Working efficiency: 125 cylinders/hour
 
Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
 LPG Cylinder Incinerator Furnace 
Used for burning off the paint on the old cylinders and liquid inside the cylinder          
Main technical parameter:
1. Furnace chamber temperature setting: <400ºC
(On the basis of meeting the requirements of burning bottles)
2. Workpiece temperature: ≈400ºC
3. Consumption of gas and fuel: Fuel burner type(100,000kcal), 4~5Kg/h·set
4. Power supply: 3.3Kw
5. Speed ratio: 493
6. Overall dimension: 16000 x 1500 x 1800mm
7. Working efficiency: 125 cylinders/hour

 
Automatic Hydro water pressure testing machine
Main parameter:
Air pressure: 0.6Mpa
Water test pressure: 3.2Mpa (adjustable)
Holding time: 60s
Irrigation time: 90s
Dewatering time: 50s
Motor power: 3KW
Weight of machine: 4ton, 6ton
No. of station: 6 station
Size of cylinder available: 320*700-420*1250mm
Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
 
After Sales Service

Installation and debugging

1, According to the specific situation of the workshop, locate equipment installation (roller conveyer top high above the ground is 400 mm).

2. connecting power and gas source, checking the water pump, hydraulic test pump, drive 

3.According to the relevant button, checking whether the parts movement is flexible.

4.Pushing and pull the hand control valve, check wheter the related parts operation is flexible.
5.Sequence of operation:

 

Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant

Matter Need Attention

1. Ensure the power supply and the gas supply smooth, prohibit to drive the motor in reversal so as to damage the components.
2. We prepare the 2-2.5Mcompression air storage tank to ensure the gas supply pressure 0.5-0.6Mpa. The main pipe and its interface of air inlet pipe should be more than G1", ensure the gas supply flowing volume is enough. 
3. Keep water clear in water tank, without any dirty, without any float sundries. If there is, remove the float drifting sundries, in case it blocks the pipeline and effect the normal test. 
4. Add 20# machinery oil onto the standard level for reducer, often check it.
5. Before shift over, pls press the "stop" button, cut off the power supply and gas supply.
6. There is safety protection for earthing in machine.
7. If you find there is abnormal on the indication of pressure-proof test actual pressure measuring meter when you start up the first batch gas cylinder testing every day, please calibrate it by the precision pressure measuring meter.
8. When equipment runs normally, pls close tightly the valve access to the precision pressure measuring meter (i.e. the calibration valve, also named as pressure meter switch).

Company Profile

Wuxi Longterm Machinery Technologies Co.,Ltd is the professional manufacturer of auto-welding equipment (MIG, TIG, MAG, PAW) and automatic welding system integration, as well as related equipment.Due to highly automatic, simple operation, welding strength and service life with the same stainless steel and plate, is widely used in aerospace, chemical industry, machinery, pressure vessels, fire extinguishers, water heater, enamel water tank, stainless steel products and other industries.

Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant
------ Our Factory Site

Our strong machining ability 

Our hired employees are over 100 for different working process, such as milling lathe,  punching machine, heat treatment, grinding machine, cause we make all machine parts by ourselves, we can ensure the parts quality by 100%.

Additionally, with strong manufacuting ability, we can delivery every order on time.

Automatic 6kg LPG Cooking Gas Steel Bottle Powder Coating Line for Manufacturing Plant

FAQ

FAQ

Q: What size of LPG cylinder your machine can powder coating?
A: 6kg, 12kg,15kgs and 50kgs LPG cylinder for cooking and other size according customers' requirement.

Q: About the price
A: The price showing on website is not the real because vary item with different price. The final quotation based on two side (customer and manufacturer) confirmed the technology project afterwards.

Q: Production cycle
A: We are a professional manufacturer of providing the powder coating system. Ensure providing a qualified  product and service, we are setting the production cycle is 60 working days. The actually lead time depends on the recent actually production planning.

Q: Service
A:We will offer the whole plant design proposal freely before place order. We are welcome customer visiting the coating line onsite anytime. We will prepare the detailed  technology proposal after get approval between customer and manufacturer. 


Enable us provide the most suitable proposal for you, please tell me following details:
1.Workpiece size/specification,weight and process requirements(Powder coating or painting?)

2.Plant foundatation drawing,including plant height (the height between factory beam to the ground) and loading&unloading position

3.Heating energy: Electric, LPG or LNG?

4.The environmental requirements of your local government

5.Voltage 

6.Daily and annual capacity.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
Product Groups
More