Motor power | 2.2KW |
Motor speed | 1400r/min |
Work spindle speed | 15.5r/min |
Working air pressure | 0.5-0.6Mpa |
Consumption per hour | 1.14m3 |
Clamping cylinder stroke | 120mm |
Rotation speed ration | 1:59 |
Weight | 0.9T |
Installation and debugging
1, According to the specific situation of the workshop, locate equipment installation (roller conveyer top high above the ground is 400 mm).
2. connecting power and gas source, checking the water pump, hydraulic test pump, drive
3.According to the relevant button, checking whether the parts movement is flexible.
4.Pushing and pull the hand control valve, check wheter the related parts operation is flexible.
5.Sequence of operation:
Matter Need Attention
1. Ensure the power supply and the gas supply smooth, prohibit to drive the motor in reversal so as to damage the components.
2. We prepare the 2-2.5M3 compression air storage tank to ensure the gas supply pressure 0.5-0.6Mpa. The main pipe and its interface of air inlet pipe should be more than G1", ensure the gas supply flowing volume is enough.
3. Keep water clear in water tank, without any dirty, without any float sundries. If there is, remove the float drifting sundries, in case it blocks the pipeline and effect the normal test.
4. Add 20# machinery oil onto the standard level for reducer, often check it.
5. Before shift over, pls press the "stop" button, cut off the power supply and gas supply.
6. There is safety protection for earthing in machine.
7. If you find there is abnormal on the indication of pressure-proof test actual pressure measuring meter when you start up the first batch gas cylinder testing every day, please calibrate it by the precision pressure measuring meter.
8. When equipment runs normally, pls close tightly the valve access to the precision pressure measuring meter (i.e. the calibration valve, also named as pressure meter switch).
Wuxi Longterm Machinery Technologies Co.,Ltd is the professional manufacturer of auto-welding equipment (MIG, TIG, MAG, PAW) and automatic welding system integration, as well as related equipment.Due to highly automatic, simple operation, welding strength and service life with the same stainless steel and plate, is widely used in aerospace, chemical industry, machinery, pressure vessels, fire extinguishers, water heater, enamel water tank, stainless steel products and other industries.
------ Our Factory Site
Our strong machining ability
Our hired employees are over 100 for different working process, such as milling lathe, punching machine, heat treatment, grinding machine, cause we make all machine parts by ourselves, we can ensure the parts quality by 100%.
Additionally, with strong manufacuting ability, we can delivery every order on time.
Maintenance
1. Add 20# machinery oil to lubricate the both side sliding blocks of pressure test pump for each shift. Add the 20# machinery oil into the reducer tank and the driving reducer meeting to requirement. After 36 hours, change one time. Then change oil one time for each 500 hours.
2. Ensure the equipment is clear without any dirty. If the pressure test pump is not used for long term, pls add the anti-corrosion water. After 3~5 minutes when start up machine, pls drain out the water storage in pipe of machine.
3. Pls add the 22# steam machinery oil into the triple oil forge device, and clean up the air filtration water piling. Add the oil into the roller table both side bearings twice for each working shift, ensure its lubrication.
4. Calibrate the pressure meter as stipulation.